LaPAC
Bids by Category (UNSPSC Segment)BUILDING AND CONSTRUCTION AND MAINTENANCE SERVICES |
To view or print the bid document, click on the bid number below. Any subsequent addenda will also be available via this website. If an addendum has been issued, it will be located directly under the bid being modified and will be designated as an addendum. Solicitations for Statewide Term Contracts are in RED.
It is the bidder's responsibility to ensure that all addenda have been reviewed and, if need be printed, signed, and returned.
WHO SHOULD BE CONTACTED? If you are having difficulty retrieving a solicitation document, or the document is incomplete, click on the code or number listed in the HELP column to obtain technical assistance. This will display a new screen that will show the person to contact to help you retrieve the document. IF, HOWEVER, YOU HAVE A QUESTION CONCERNING THE DETAILS OF A SOLICITATION, CONTACT THE PERSON LISTED IN THE SOLICITATION DOCUMENT.
To change the sort order (Bid Number, Bid Open Date/Time),
click on the underlined column heading to sort by that value.
Bid Number | Description | Date Issued | Bid Open Date/Time | Help |
---|---|---|---|---|
50012-564-24 |
Renovations for Louisiana Tech Counseling Services
Original: 50012-564-24 |
12/04/2023 | 01/17/2024
2:00:00 PM CT |
50012 |
50011-ULLAF24210 |
NIRC BUILDING 28 CARGO ELEVATOR INSTALLATION
DUE: 10:00 AM OPENS: 11:00 AM OPTIONAL PRE-BID: 12/6/2023 Original: 50011-ULLAF24210 |
11/29/2023 | 01/11/2024
10:00:00 AM CT |
50011 |
DRAWINGS ADDED
Addendum 1: 50011-ULLAF24210-1 |
11/29/2023 | |||
20008-2023-30-7830 |
2023-30-7830 City Hall Elevator Modernization and Upgrade
Mandatory Pre-Proposal Meeting 12/18/23 at 13:00 Original: 20008-2023-30-7830 |
11/28/2023 | 01/10/2024
2:00:00 PM CT |
20008 |
JPP-50-00143963 |
JEFFERSON PARISH TRANSIT BUS STOP IMPROIVEMENTS
Original: JPP-50-00143963 |
11/22/2023 | 01/04/2024
2:00:00 PM CT |
JPP |
123460-2023-SWB-98(30260) |
Carrollton Basin No. 19 Sewer Rehabilitation
Original: 123460-2023-SWB-98(30260) |
12/01/2023 | 12/28/2023
11:30:00 AM CT |
123460 |
JPP-50-00143950 |
Labor, Materials and Equipment Necessary to Remodel the Eastbank
Outside Maintenance Building for the Jefferson Parish Water Department Original: JPP-50-00143950 |
11/22/2023 | 12/21/2023
2:00:00 PM CT |
JPP |
3000022198 |
Limestone Parking Lot Repairs - LUMCON
Original: 3000022198 Attachments: Attachment A - Special Terms and Conditions Pages 1-12 Attachment B - Job Site Verification Form - Page 1 Attachment C - Specifications - Page 1 |
11/27/2023 | 12/21/2023
10:00:00 AM CT |
107001 |
3000022159 |
Infirmary Roof Repair - DOC
Original: 3000022159 Attachments: Attachment A - Special Terms and Conditions Pages 1-14 Attachment B - Job Site Verification Form - Page 1 Attachment C - Specifications - Pages 1-3 |
11/21/2023 | 12/20/2023
10:00:00 AM CT |
107001 |
923456-23-41-2 |
BID - Pearl River Diversion Canal Restoration
Original: 923456-23-41-2 |
11/15/2023 | 12/19/2023
2:00:00 PM CT |
923456 |
Addendum 1 - BID OPENING CHANGED
Addendum 1: 923456-23-41-2-1 |
12/04/2023 | |||
Addendum 2 - Questions & Answers
Addendum 2: 923456-23-41-2-2 |
12/06/2023 | |||
JPP-50-00143666 |
Hurricane IDA Roof Repair & Replacement Mike Miley Playground 6716 W.
Metairie Ave, Metairie, La 70003 Project NO. 20-22045 Original: JPP-50-00143666 |
11/08/2023 | 12/19/2023
2:00:00 PM CT |
JPP |
JPP-50-00143841 |
Canal A. Bridges, Project No. 2022-015-RB
Pre-Bid Meeting 11/30/23 @ 10:00AM, GGB 200 Derbigny Gretna Original: JPP-50-00143841 |
11/15/2023 | 12/19/2023
2:00:00 PM CT |
JPP |
JPP-50-00144005 |
Labor, Materials and Equipment Necessary to Clean and Seal the Exterio
r of the Joseph Yenni Building for the Department of General Services Original: JPP-50-00144005 |
11/22/2023 | 12/19/2023
2:00:00 PM CT |
JPP |
20008-21-ASC-CP-1454 |
EBR PARISH PRISON BUILDING Q HVAC REPLACEMENT
Original: 20008-21-ASC-CP-1454 |
11/09/2023 | 12/14/2023
2:00:00 PM CT |
20008 |
ADDENDUM 1
Addendum 1: 20008-21-ASC-CP-1454-1 |
11/16/2023 | |||
ADDENDUM 2
Addendum 2: 20008-21-ASC-CP-1454-2 |
11/17/2023 | |||
654321-23-FAC-0026 |
Chase Academy Renovation
Original: 654321-23-FAC-0026 |
11/21/2023 | 12/14/2023
2:00:00 PM CT |
654321 |
654321-23-FAC-0036 |
Window & Exterior Envelope Repairs @ James Skelly Wright School
Original: 654321-23-FAC-0036 |
11/16/2023 | 12/14/2023
2:00:00 PM CT |
654321 |
JPP-50-00143751 |
Hurricane Ida Roof Repair & Replacement at Belle Terre Playground
Pre-Bid Meeting 11/28/23 @ 9:00AM, 5550 Belle Terre Rd. Marrero Original: JPP-50-00143751 |
11/08/2023 | 12/14/2023
2:00:00 PM CT |
JPP |
123460-2023-SWB-96(30259) |
CARROLLTON BASIN NO. 18 SEWER REHABILITATION
Original: 123460-2023-SWB-96(30259) |
11/17/2023 | 12/14/2023
11:30:00 AM CT |
123460 |
Addendum 1
Addendum 1: 123460-2023-SWB-96(30259)-1 |
12/04/2023 | |||
3000021987 |
Water Tank Repair, Blast, & Painting-LDH
Original: 3000021987 Attachments: Attachment A - Special Terms and Conditions Pages 1-13 Attachment B - Job Site Verification Form - Page 1 Attachment C - Specifications - Pages 1-3 Attachment D - Containment System Diagrams - Pages 1-15 Attachment E - Guide for Containing Debris Pages - 1-21 |
11/02/2023 | 12/13/2023
10:00:00 AM CT |
107001 |
Addendum No. 1 – Vendor’s Questions and State’s Responses, Bid Opening
Addendum 1: 3000021987-1 Attachments: Addendum No. 1 Attachment F - Elevated Tank Inspection Pictures - Pages 1-6 Attachment G - Elevated Tank Inspection Report Revised Attachment C - Specifications - Pages 1-3 |
11/22/2023 | |||
Addendum No. 2 – Vendor’s Questions and State’s Responses and Bid Open
Addendum 2: 3000021987-2 Attachments: Addendum No. 2 |
11/29/2023 | |||
923456-23-48-2 |
BID - 2023 District 6 Supplemental
Original: 923456-23-48-2 |
11/15/2023 | 12/12/2023
2:00:00 PM CT |
923456 |
923456-23-49-2 |
2023 District 1,4,5,10 Supplemental
Original: 923456-23-49-2 |
11/15/2023 | 12/12/2023
2:00:00 PM CT |
923456 |
123460-2023-SWB-91(30232) |
CARROLLTON BASIN NO. 3 SEWER REHABILITATION
Original: 123460-2023-SWB-91(30232) |
11/10/2023 | 12/11/2023
11:30:00 AM CT |
123460 |
Addendum 1 - Pre-Bid Attendance
Addendum 1: 123460-2023-SWB-91(30232)-1 |
11/29/2023 | |||
Addendum 2
Addendum 2: 123460-2023-SWB-91(30232)-2 |
12/01/2023 | |||
923456-23-42-2 |
Million Dollar Rd
Original: 923456-23-42-2 |
11/08/2023 | 12/07/2023
2:00:00 PM CT |
923456 |
123460-2023-SWB-86(30258) |
CARROLLTON BASIN NO. 17 SEWER REHABILITATION
Original: 123460-2023-SWB-86(30258) |
10/27/2023 | 12/07/2023
11:00:00 AM CT |
123460 |
Addendum 1 - Pre-Bid Attendance
Addendum 1: 123460-2023-SWB-86(30258)-1 |
11/14/2023 | |||
Addendum 2
Addendum 2: 123460-2023-SWB-86(30258)-2 |
11/22/2023 | |||
Addendum 3
Addendum 3: 123460-2023-SWB-86(30258)-3 |
11/22/2023 | |||
Addendum 3
Addendum 4: 123460-2023-SWB-86(30258)-4 |
11/22/2023 | |||
50018-240020 |
Carver Hall Biology Lab Renovations-Rm. 174
Mandatory Pre-Bid Site Visit 11/15/23 at 10:00am - Carver Hall Lobby Original: 50018-240020 |
11/07/2023 | 12/07/2023
10:00:00 AM CT |
50018 |
Addendum 4- Updated Bid information
Addendum 1: 50018-240020-1 |
11/07/2023 | |||
Addendum 2- Additional Specifications-Update Bid opening
Addendum 2: 50018-240020-2 |
11/16/2023 | |||
Addendum 3- Updated Bid Documents
Addendum 3: 50018-240020-3 |
11/16/2023 | |||
Addendum 3- Extended Bid Opening
Addendum 4: 50018-240020-4 |
11/24/2023 | |||
40007-232405 |
Rebid Elevator Maintenance for BRCC
Original: 40007-232405 |
11/13/2023 | 12/05/2023
10:00:00 AM CT |
40007 |
50015-231130 |
Furnish Labor and Materials for Repairs to Turtle Cove for the
Facility Planning Dept. LA Contractors License Required. Original: 50015-231130 |
10/30/2023 | 11/30/2023
4:00:00 PM CT |
50015 |
11/2/2023
Addendum 1: 50015-231130-1 |
11/06/2023 | |||
11/21/2023
Addendum 2: 50015-231130-2 |
11/21/2023 | |||
20008-14-AR-MS-034C |
Flannery Road-Florida Boulevard Area Rehabilitation Project Phase 3
Original: 20008-14-AR-MS-034C |
10/27/2023 | 11/30/2023
2:00:00 PM CT |
20008 |
ADDENDUM 1
Addendum 1: 20008-14-AR-MS-034C-1 |
11/17/2023 | |||
ADDENDUM 2
Addendum 2: 20008-14-AR-MS-034C-2 |
11/27/2023 | |||
20008-23-SS-MS-0032 |
ANNUAL PARISHWIDE STREET SWEEPING PROJECT
Original: 20008-23-SS-MS-0032 |
10/27/2023 | 11/30/2023
2:00:00 PM CT |
20008 |
ADDENDUM 1
Addendum 1: 20008-23-SS-MS-0032-1 |
11/17/2023 | |||
40015-Nunez-AerospaceBuillding |
renovation to the Aerospace Building
Original: 40015-Nunez-AerospaceBuillding |
10/16/2023 | 11/30/2023
2:00:00 PM CT |
40015 |
Supplement to the proposal
Addendum 1: 40015-Nunez-AerospaceBuillding-1 |
10/25/2023 | |||
Contract terms and budget
Addendum 2: 40015-Nunez-AerospaceBuillding-2 |
10/27/2023 | |||
Non-Mandatory Site Visit and Accent Paint
Addendum 3: 40015-Nunez-AerospaceBuillding-3 |
11/06/2023 | |||
extended bid opening date Monday November 27, 2023 at 2:00 pm
Addendum 4: 40015-Nunez-AerospaceBuillding-4 |
11/09/2023 | |||
Clarifications and No preferred sub-contractor of vendor by Nunez.
Addendum 5: 40015-Nunez-AerospaceBuillding-5 |
11/13/2023 | |||
extended bid opening date Monday November 27, 2023 at 2:00 pm
Addendum 6: 40015-Nunez-AerospaceBuillding-6 |
11/14/2023 | |||
Clarification of Addendum 5 and other clarifications and answers
Addendum 7: 40015-Nunez-AerospaceBuillding-7 |
11/17/2023 | |||
Bid extension and remove and replace S4 with the attached S4
Addendum 8: 40015-Nunez-AerospaceBuillding-8 |
11/21/2023 | |||
Response to Questions from potential bidders
Addendum 9: 40015-Nunez-AerospaceBuillding-9 |
11/21/2023 | |||
923456-23-43-2 |
STPSO Jail Roof Replacement – Buildings A, B and C
Original: 923456-23-43-2 |
11/01/2023 | 11/30/2023
2:00:00 PM CT |
923456 |
Addendum No. 1 Site Visit
Addendum 1: 923456-23-43-2-1 |
11/14/2023 | |||
Addendum No. 2 Vendor Questions and Department Answers/Clarifications
Addendum 2: 923456-23-43-2-2 |
11/22/2023 | |||
JPP-50-00143745 |
Labor, Materials & Equipment, Transportation & all Incidental to
Provide a Five Year Termite Treatment Contract for Jefferson Parish. Original: JPP-50-00143745 |
10/25/2023 | 11/30/2023
2:00:00 PM CT |
JPP |
JPP-50-00143842 |
Pre-Placed Emergency Contract for Point REpair and/or Emergency
Restoration of Existing Sewer Mainlines, Forced Mains, Lift Stations, Original: JPP-50-00143842 |
11/01/2023 | 11/30/2023
2:00:00 PM CT |
JPP |
Addendum #1 Revisions
Addendum 1: JPP-50-00143842-1 |
11/09/2023 | |||
123461-3608 |
Criminal District Court - Structural Wind Retro-Fit
For specs and drawings: Supplier Portal for the City of New Orleans Original: 123461-3608 |
10/12/2023 | 11/30/2023
1:30:00 PM CT |
123461 |
123460-2023-SWB-77(30229) |
CARROLLTON BASIN NO. 1 SEWER REHABILITATION
Original: 123460-2023-SWB-77(30229) |
11/03/2023 | 11/30/2023
11:30:00 AM CT |
123460 |
Addendum 1
Addendum 1: 123460-2023-SWB-77(30229)-1 |
11/16/2023 | |||
Addendum 2 Pre-Bid Attendance
Addendum 2: 123460-2023-SWB-77(30229)-2 |
11/17/2023 | |||
Addendum 3
Addendum 3: 123460-2023-SWB-77(30229)-3 |
11/22/2023 | |||
3000021953 |
Elevator Maintenance - LDWF Rockefeller
Original: 3000021953 Attachments: Attachment A - Special Terms and Conditions - Pages 1-8 Attachment B - Elevator Specifications - Pages 1-16 Attachment C - Agency's Terms and Conditions - Pages 1-3 Attachment D - Hydraulic Passenger Elevators - Pages 1-3 Attachment E - Contractor's License Certification Form - Page 1 Attachment F - Elevator Maintenance Logs - Pages 1-3 Attachment G - Price Sheet - Page 1 Attachment H - Online Bidding Instructions - Pages 1-10 |
11/07/2023 | 11/30/2023
10:00:00 AM CT |
107001 |
3000022090 |
Foundation Repairs - LDH
Original: 3000022090 Attachments: Attachment A - Special Terms and Conditions - Pages 1-13 Attachment B - Jobsite Verification Form - Page 1 Attachment C - Specifications - Page 1 |
11/08/2023 | 11/29/2023
10:00:00 AM CT |
107001 |
JPP-50-00143778 |
Labor, Materials, and Equipment needed to Remove and Replace Existing
Flooring in the Gymnasium at The Kennedy Heights Playground Original: JPP-50-00143778 |
10/25/2023 | 11/28/2023
2:00:00 PM CT |
JPP |
Add #1-Q&A; Drawing
Addendum 1: JPP-50-00143778-1 |
11/15/2023 | |||
JPP-50-00143801 |
JEFFERSON PARISH NTRANSIT BUS STOP IMPROVEMENTS DISTRICT 3- EAST BANK
Original: JPP-50-00143801 |
10/18/2023 | 11/28/2023
2:00:00 PM CT |
JPP |
123461-3647 |
Morris F.X. Jeff Sr. Track Resurfacing
Specifications and Drawings: The City of New Orleans Supplier Portal Original: 123461-3647 |
10/25/2023 | 11/28/2023
1:00:00 PM CT |
123461 |
123461-3666_3675-3678 |
Public Works Trade: Plumbing Services Zones 1 - 5
For specs: Supplier Portal for the City of New Orleans Original: 123461-3666_3675-3678 |
11/15/2023 | 11/28/2023
11:00:00 AM CT |
123461 |
123461-3670-3674 |
Public Works Trade: HVAC Services Zones 1 - 5
For specs: Supplier Portal for the City of New Orleans Original: 123461-3670-3674 |
11/15/2023 | 11/28/2023
11:00:00 AM CT |
123461 |
123461-3679-3683 |
Public Works Trade: Roofing Services Zones 1 - 5
For specs: Supplier Portal for the City of New Orleans Original: 123461-3679-3683 |
11/15/2023 | 11/28/2023
11:00:00 AM CT |
123461 |
123461-3694-3698 |
Public Works Trade: Painting Services Zones 1 - 5
For specs: Supplier Portal for the City of New Orleans Original: 123461-3694-3698 |
11/15/2023 | 11/28/2023
11:00:00 AM CT |
123461 |
123461-3699-3703 |
Public Works Trade: Electrical Services Zones 1 - 5
For specs: Supplier Portal for the City of New Orleans Original: 123461-3699-3703 |
11/15/2023 | 11/28/2023
11:00:00 AM CT |
123461 |
50011-ULLAF24207 |
GREENHOUSE ADDITION - PHASE 3 - BILLEAUD HALL
DUE 2:00PM OPENS 3:00PM Original: 50011-ULLAF24207 |
10/23/2023 | 11/21/2023
2:00:00 PM CT |
50011 |
CLARIFICATIONS TO SPECIFICATIONS
Addendum 1: 50011-ULLAF24207-1 |
10/25/2023 | |||
CLARIFICATION TO SPECIFICATIONS
Addendum 2: 50011-ULLAF24207-2 |
11/07/2023 | |||
923456-23-55-1 |
QUOTE - Camp Salmen and Koop Drive Trail Head - Fitness Court Slabs
Original: 923456-23-55-1 |
11/07/2023 | 11/21/2023
2:00:00 PM CT |
923456 |
3000022060 |
*Rebid* Remove/Replace Concrete - DPS
Original: 3000022060 Attachments: Attachment A - Special Terms and Conditions - Pages 1-13 Attachment B - Jobsite Verification Form - Page 1 Attachment C - Specifications - Page 1 |
10/31/2023 | 11/21/2023
10:00:00 AM CT |
107001 |
115FPC-01_107_22H_OFC_F.010043 |
RFQ CMAR Phase II Renovations Northwest La State Office Building
Original: 115FPC-01_107_22H_OFC_F.010043 |
10/11/2023 | 11/17/2023
2:00:00 PM CT |
115FPC |
Exhibit A, Draft form of Agreement
Addendum 1: 115FPC-01_107_22H_OFC_F.010043-1 |
10/11/2023 | |||
Exhibit B, General Conditions
Addendum 2: 115FPC-01_107_22H_OFC_F.010043-2 |
10/11/2023 | |||
Exhibit C, Program
Addendum 3: 115FPC-01_107_22H_OFC_F.010043-3 |
10/11/2023 | |||
Exhibit D, Schematic Design
Addendum 4: 115FPC-01_107_22H_OFC_F.010043-4 |
10/11/2023 | |||
Exhibit E, Pre-Proposal Conference Agenda and Clarifications
Addendum 5: 115FPC-01_107_22H_OFC_F.010043-5 |
11/09/2023 | |||
923456-23-54-1 |
Fish Hatchery Road Drainage Repair
Original: 923456-23-54-1 |
11/01/2023 | 11/16/2023
2:00:00 PM CT |
923456 |
Addendum No. 1 Vendor Questions and Department Answers
Addendum 1: 923456-23-54-1-1 |
11/13/2023 | |||
123460-2023-SWB-76(30230) |
Carrollton Basin No. 2 Sewer Rehabiliation
Original: 123460-2023-SWB-76(30230) |
10/20/2023 | 11/16/2023
11:30:00 AM CT |
123460 |
Addendum 1 - Pre-Bid Attendance
Addendum 1: 123460-2023-SWB-76(30230)-1 |
11/06/2023 | |||
Addendum 2
Addendum 2: 123460-2023-SWB-76(30230)-2 |
11/08/2023 | |||
50019-000279 |
IT backup Room, Mandatory Pre-Bid Site Visit October 25, 2023 @ 10:00a
Original: 50019-000279 |
10/06/2023 | 11/15/2023
4:00:00 PM CT |
50019 |
Site Plan
Addendum 1: 50019-000279-1 |
10/16/2023 | |||
Stulz an approved equal
Addendum 2: 50019-000279-2 |
11/10/2023 | |||
40006-R0026754 |
Flooring materials
Title of the Bid is "R0026754 - FLOORING MATERIALS" Original: 40006-R0026754 |
10/30/2023 | 11/15/2023
2:00:00 PM CT |
40006 |
Correction to Page 1
Addendum 1: 40006-R0026754-1 |
11/01/2023 | |||
Answers to questions - Addendum is 3 pages
Addendum 2: 40006-R0026754-2 |
11/08/2023 | |||
923456-23-50-1 |
QUOTE - Brookside Drive Drainage Improvements
Original: 923456-23-50-1 |
10/31/2023 | 11/15/2023
2:00:00 PM CT |
923456 |
923456-23-53-1 |
QUOTE - BLACKWELL DRIVE
Original: 923456-23-53-1 |
10/31/2023 | 11/15/2023
2:00:00 PM CT |
923456 |
3000022014 |
Remove/Replace Refrigerant Monitor - LDH
Original: 3000022014 Attachments: Attachment A - Special Terms and Conditions - Pages 1-13 Attachment B - Jobsite Verification Form - Page 1 Attachment C - Specifications - Page 1 |
10/23/2023 | 11/15/2023
10:00:00 AM CT |
107001 |
923456-23-49-1 |
Cherry Laurel Drainage/Curb Repair
Original: 923456-23-49-1 |
10/26/2023 | 11/14/2023
2:00:00 PM CT |
923456 |
JPP-50-00143824 |
Two (2) Year Contract for Preventative Maintenance and Repairs on
Various Makes and Models of Overhead Doors for the Fire Department Original: JPP-50-00143824 |
10/18/2023 | 11/14/2023
2:00:00 PM CT |
JPP |
20008-A23-0811Supplemental |
A23-0811 Supplemental MaintTesting/MonitoringofFireAlarms/Smoke Det
Original: 20008-A23-0811Supplemental |
10/17/2023 | 11/14/2023
11:00:00 AM CT |
20008 |
Questions and Answers
Addendum 1: 20008-A23-0811Supplemental-1 |
11/08/2023 | |||
115FPC-19_621_22_01_F.19002436 |
RFQ CMAR New Nursing Building Nicholls State University Thibodaux LA
Original: 115FPC-19_621_22_01_F.19002436 |
10/09/2023 | 11/13/2023
2:00:00 PM CT |
115FPC |
Exhibit A, Draft form of Agreement
Addendum 1: 115FPC-19_621_22_01_F.19002436-1 |
10/09/2023 | |||
Exhibit B, General Conditions
Addendum 2: 115FPC-19_621_22_01_F.19002436-2 |
10/09/2023 | |||
Exhibit C, Program
Addendum 3: 115FPC-19_621_22_01_F.19002436-3 |
10/09/2023 | |||
Exhibit D, Schematic Design
Addendum 4: 115FPC-19_621_22_01_F.19002436-4 |
10/09/2023 | |||
Correction to LaPAC Proposal Deadline
Addendum 5: 115FPC-19_621_22_01_F.19002436-5 |
10/12/2023 | |||
Exhibit E, Pre-Proposal Conference Agenda and Answers to Questions
Addendum 6: 115FPC-19_621_22_01_F.19002436-6 |
11/06/2023 | |||
JPP-50-00143389 |
Kennedy Heights Playground Improvements
Pre-Bid Meeting 10/26/23 @9:30AM, 248 Mission Ct. Avondale La. 70094 Original: JPP-50-00143389 |
10/11/2023 | 11/09/2023
2:00:00 PM CT |
JPP |
JPP-50-00143545 |
FURNISH LABOR, MATERIALS AND EQUIPMENT TO INSTALL A NEW APPARATUS BAY
Original: JPP-50-00143545 |
10/11/2023 | 11/09/2023
2:00:00 PM CT |
JPP |
123460-2023-SWB-85(30257) |
Carrollton Basin No. 16 Sewer Rehabilitation
Original: 123460-2023-SWB-85(30257) |
10/12/2023 | 11/09/2023
11:30:00 AM CT |
123460 |
Addendum 1
Addendum 1: 123460-2023-SWB-85(30257)-1 |
10/30/2023 | |||
Updated Addendum 1 with Sign-In Sheet
Addendum 2: 123460-2023-SWB-85(30257)-2 |
10/31/2023 | |||
Addendum 2
Addendum 3: 123460-2023-SWB-85(30257)-3 |
11/02/2023 | |||
Addendum 3
Addendum 4: 123460-2023-SWB-85(30257)-4 |
11/03/2023 | |||
123461-3607 |
MYH Fishing Pier
For specs and drawings: Supplier Portal for the City of New Orleans Original: 123461-3607 |
10/11/2023 | 11/08/2023
1:00:00 PM CT |
123461 |
JPP-50-00143458 |
Labor, Materials and Equipment Necessary to Install an Outdoor Fitness
Station at Williams Playlot for the Jefferson Parks and Recreation Original: JPP-50-00143458 |
10/11/2023 | 11/07/2023
2:00:00 PM CT |
JPP |
3000021849 |
Evaporator Coil Replacement - DMA
Bid Cancelled: 11/09/2023 Original: 3000021849 Attachments: Attachment A - Special Terms and Conditions Pages 1-13 Attachment B - Job Site Verification Form - Page 1 Attachment C - Specifications - Pages 1-3 |
09/27/2023 | 10/19/2023
10:00:00 AM CT |
107001 |
Addendum No. 1 – CANCELLATION
Date Issued: 11/9/23
Your reference is
Addendum 1: 3000021849-1 |
11/09/2023 |