Contract Line Detail

Contract # 4400013450   Contract Line Item # 3  
Product Category 56112104 - Executive seating   Delivery Days ARO 0
Material Number  
Supplier Text Installation Services: 5% of list for installation. General Terms & Exclusions: Install hours at 8-5 M-F Night weekends holidays extra and quoted by the project The job site shall be clean and free of debris prior to installation Free access to buildings must be granted Labor cost may be adjusted if trucks cannot unload directly at the building site Police and security to be provided by the owner if we are to block sidewalk/driveway/street because of location of the dock/doors Elevator access w/o other trades to speed up install and reduce our expenses Other trades should be out of the space Secured lock and key storage if the project cannot be completed must be supplied at the site by the customer. If the dealer must remove product and return later, additional fees will be incurred. If the dealer must make multiple trips because the building is not ready, or blocked by other trades people, additional fees may be incurred Customer to supply a licensed electrician to connect all power hard wired connections.

Locations
Statewide

Contract Line Description:
    Installation Services:

Catalog Items

1-1 of 1
MDM Catalog
Ref. #
Supplier
Part #
Catalog Item Long Description UOM Gross Price Discount Per
Qty.
1052740
Installation Services: 5% of List for install. General Terms & Exclusions: Install hours 8-5 M-F. Night weekends holiday extra and qouted by the project. The job site shall be clean and free of debris prior to installation. Free access to buildings must be granted. Labor cost may be adjusted if trucks cannot unload directly at the buildingsite. Police or security to be provide by the owner if we are to block sidewalk/driveway/street because of location of the dock/doors. Elevator access w/o other trades to speed up install and reduce our expenses. Other trades should be out of the space. Secured lock and key storage if the project cannot be completed must be supplied at the site by the customer. If the dealer must remove product and return later, additional fees will be incurred. If the dealer must make multiple trips becuase the building is not ready, or blocked by other trades people, additional fees may be incurred. Cutomer to supply a licensed electrician to connect all power hard wired connections.
Each $0.00 0.00% 1
1-1 of 1